Project Background

Purchased three zero emission battery-electric shuttle buses and built a charging station. Prior to the purchase of these vehicles, the Tide Shuttle was operating primarily in the summer months. The 3 electric buses extend the service to a year-round operation, operating between Main Street area, Third Street Promenade, the Pier, beaches and major downtown hotels. The project demonstrated the viability of battery-electric shuttle buses. Automobile (including taxi service) trips in the major tourist areas of Santa Monica were reduced.

Emission Tons CO Annual
0.00
Emission Tons CO Total
0.00
Emission Tons NOX Annual
0.00
Emission Tons PM Annual
0.00
Emission Tons PM Total
0.00
Emission Tons Rog Annual
0.00
Emission Tons Rog Total
0.00
Project Cost Description

11338933.00

Project Implementation

The City of Santa Monica in the areas outlined above.

Project Results Description

Projected lifetime emission reductions are: Reactive Organic Gases, 1,100 pounds; Oxides of Nitrogen, 3,120 pounds, and Particulate Matter, 27 pounds.

Project Status Description

Details of the charging station construction, design specifications of the buses bought, charging systems for the buses, and information on the bus performances and driving recommendations for maximum utilization.

Project Year
Summary Approved
No
Total Project Cost
$11,338,900.00
Co Funding Amount
$0.00
Project Category
Contractor Address
1865 Main Street
Contractor Agency
City of Santa Monica
Contractor City
Santa Monica
Contractor Contact
Joseph W. Stitcher
Contractor Country
United States of America
Contractor State
CA
Contractor Phone
Contractor ID
96014
Contractor Zip
90407
Co Participants
Storms & Lowe Electrical Engineers, Global Engineering Documents, Royal Wholesale Electric, RSE-Sierra, Southern California Edison (SCE), Cordell Electric, Acurex Environmental
Final Approval Date
Final Report Approved
No