Waste Management - Moreno Valley Purchase of 20 CNG Waste Collection Vehicles

Contract Number
00011
MSRC Award
$995,520.00
Project Background

Waste Management Moreno Valley District purchased twenty (20) new compressed natural gas (CNG) fueled refuse collection vehicles. The vehicles replace older, diesel-fueled vehicles. Waste Management's objective to to convert the entire Moreno Valley District fleet of 75 trucks to alternative fuel. The vehicles purchased under this contract are Volvo Expeditor waste collection vehicles equipped with dedicated CNG Cummins 8.3 liter engines. The life expectancy of each vehicle is twelve years.

Emission Tons CO Annual
0.00
Emission Tons CO Total
0.00
Emission Tons NOX Annual
0.00
Emission Tons PM Annual
0.00
Emission Tons PM Total
0.00
Emission Tons Rog Annual
0.00
Emission Tons Rog Total
0.00
Project Cost Description

4285760.00

Project Implementation

The reduction in diesel particulate matter directly benefits the communities served by these waste collection vehicles. In addition, the reduction in oxides of nitrogen benefits the entire South Coast region.

Project Results Description

The total annual emissions reductions attributable to the 20 CNG heavy-duty vehicles is as follows: Oxides of Nitrogen (NOx): 11.29 tons per year

Project Status Description

The final report contains an Abstract, Summary and Conclusions, Challenges and Lessons Learned, Recommendations, and Emissions Reductions.

Project Year
1999
Summary Approved
No
Total Project Cost
$4,285,760.00
Co Funding Amount
$0.00
Contractor Address
17700 Indian Street
Contractor Agency
Waste Management Moreno Valley District
Contractor City
Moreno Valley
Contractor Contact
J. Alex Braicovich
Contractor Country
United States of America
Contractor State
CA
Contractor Phone
Contractor ID
11
Contractor Zip
92551
Co Participants
The following organizations supported Waste Management during project implementation as co-participates:
Volvo Trucks of North America
Cummins Engine Company
NGV Ecotrans
Pickens Fuel Corporation.
Final Approval Date
Final Report Approved
No