City of Ontario Bicycle Paramedic Program

Contract Number
01006
MSRC Award
$4,338.00
Project Background

The City of Ontario Fire Department implemented a Bicycle Assessment Team that can be deployed in high traffic or activity areas known to generate numerous calls for service for both pre-hospital emergency medical services and other types of emergencies.  With the opening of the Ontario Mills Mall in 1996, the Ontario Fire Department experienced a simultaneous increase in call volume.  Over a three year period, the Fire Department responded to the Mills Mall over 900 times - equal to the number of responses in a small city over the same period.  

A review of dispatch data revealed that the last two weeks in August, last week in November, and the month of December generated more calls than any other time during the year.  Response teams dispatched from the eight fire stations in Ontario encountered severe traffic congestion, resulting not only in delays in attending to the distressed individual, but increased heavy-duty vehicle emissions as well.

The Fire Department determined that the use of a pre-deployment force of one paramedic and one EMT on bicycles at the Mills Mall could reduce response times dramatically.  From an air quality perspective, the advance team could limit the response of fire engines and paramedic vehicles dispatched from local stations, reducing emissions associated with these vehicles.

Project Cost Description

MSRC funds were used to co-fund the purchase of bicycles and equipment.

Project Implementation

The City of Ontario and patrons of the Ontario Mills Mall benefit directly from this project.  However, the reduction in ozone precursor emissions benefits a large area within the Inland Empire.

Project Potential

The use of bicycle paramedics and EMTs is applicable to most Fire Departments.  The bicycle units are especially useful at large venues or special events, as well as shopping centers.

Project Results Description

This project results in the following annual emission reductions:

Reactive Organic Gases (ROG):  9 pounds
Oxides of Nitrogen (NOx):    102 pounds
Carbon Monoxide (CO):         42 pounds
Particulate Matter (PM10):   121 pounds

Project Status Description

The Final Report includes a thorough Project Description, Summary and Conclusions, Recommendations, Emission Benefits, and the results of an interdepartmental survey.

Project Year
2001
Summary Approved
No
Total Project Cost
$71,612.00
Project Category
Contractor Address
425 East B Street
Contractor Agency
City of Ontario Fire Department
Contractor City
Ontario
Contractor Contact
Ray Ramirez
Contractor Country
United States
Contractor State
CA
Contractor Phone
Contractor Zip
91764
Final Report Approved
No