Project Background

SunLine Transit Agency purchases six new, orginal equipment heavy-duty compressed natural gas (CNG) vehicles used to provide street sweeping services under contract to the Coachella Valley Association of Governments (CVAG). In March of 2004, SunLine was notified that CVAG had selected another street sweeping contractor; hence, the six pieces of equipment were transfered to CVAG and continue to be used as an element of their regional street sweeping program. The six pieces of equipment include two (2) Tymco Model 600 street sweepers; one Freightliner VacAll sweeper; two (2) Freightliner 2-axle dump trucks, and one Lee Boy 3000 force feed loader. The vehicles are used to remove sand from road surfaces in the Coachella Valley as a means to mitigate particulate matter (PM10) emissions.

Emission Tons CO Annual
0.00
Emission Tons CO Total
0.00
Emission Tons NOX Annual
0.00
Emission Tons PM Annual
0.00
Emission Tons PM Total
0.00
Emission Tons Rog Annual
0.00
Emission Tons Rog Total
0.00
Project Cost Description

1331841.00

Project Implementation

The Coachella Valley directly benefits from this project, as the Clean Streets Management Program reduces airborne particulate matter emissions from roadways.

Project Results Description

Annual emission reductions attributable to this project are as follows: Oxides of Nitrogen (NOx): 1.4621 tons per year Particulate Matter (PM10): 1.4958 tons per year

Project Status Description

The Final Report includes a summary of work performed under ths contract, a detailed specification of the equipment purchased, as well as copies of pertinent contract administration documents.

Project Year
2001
Summary Approved
No
Total Project Cost
$1,331,840.00
Co Funding Amount
$0.00
Contractor Address
32-505 Harry Oliver Trail
Contractor Agency
SunLine Transit Agency
Contractor City
Thousand Palms
Contractor Contact
Chuck Phillips
Contractor Country
United States of America
Contractor State
CA
Contractor Phone
Contractor ID
0
Contractor Zip
92276-3501
Co Participants
SunLine was the sole implementer of this project.
Final Approval Date
Final Report Approved
No
Start Date
End Date