Purchase 11 CNG Refuse Trucks

Contract Number
MS10019
MSRC Award
$379,549.00
Project Background

EDCO Waste and Recycling Services Company provides waste disposal services throughout Los Angeles and Orange Counties. EDCO has made a commitment to transition its fleet from diesel-fueled waste disposal vehicles to vehicles fueled by cleaner burning natural gas. To date, EDCO has purchased 40 new CNG-fueled solid waste disposal trucks.

Emission Tons CO Annual
0.00
Emission Tons CO Total
0.00
Emission Tons NOX Annual
0.24
Emission Tons PM Annual
0.00
Emission Tons PM Total
0.00
Emission Tons Rog Annual
0.00
Emission Tons Rog Total
0.00
Project Cost Description

1923328

Project Implementation

EDCO purchased the eleven new refuse collection trucks from EW Trucks & Equipment, located in San Diego, CA. The truck model selected was the Expediter, manufactured by Autocar. The truck body manufacturers were C.W.S. Industries, located in Vernon, and Refuse Power Systems, located in Simi Valley. Final vehicle assemble was conducted by Agility Trucks in Fontana. Two vehicle configurations were purchased - front loader trucks, which are primarily used in commercial waste collection operations, and automated side loaders, which are used in residential trash pickup. The eleven new refuse trucks replaced older diesel trucks that were relocated outside of the South Coast AQMD on a permanent basis. The new CNG refuse trucks are equipped with the Cummins ISL G 8.9L engine, certified by the California Air Resources Board at a NOx emissions rating of 0.13 g/bhp-hr, making this one of the lowest-emitting heavy-duty engines commercially available.

Project Objectives

The objective of this project was to remove from service eleven (11) older diesel fueled solid waste collection vehicles and replace them with new, state-of-the-art trucks fueled with compressed natural gas (CNG).

Project Results Description

The new refuse trucks are anticipated to operate approximately 1,189 hour per year per vehicle.

Project State
California
Project Status Description

All eleven vehicles have been received and are currently operating in revenue service in the City of Buena Park. To date, no serious technical issues have been encountered.

Project Year
2010
Summary Approved
No
Total Project Cost
$1,923,330.00
Co Funding Amount
$1,543,780.00
Contractor Address
6762 Stanton Avenue
Contractor Agency
EDCO Disposal Corporation
Contractor City
Buena Park
Contractor Contact
Steve South
Contractor Country
United States of America
Contractor State
CA
Contractor Phone
Contractor ID
0
Contractor Zip
90621
Co Participants
Clean Fleets
EW Truck & Equipment
C.W.S. Industries
Refuse Power Systems
Agility
Final Approval Date
Final Report Approved
Yes
Final Report